Summary
Fuel cell power systems installation.
- Specialty generation article.
Study notes from the app's code library — always confirm with the official NEC book your AHJ adopts.
Sections in Code Lookup (26)
- 692.1Scope
- 692.2Definitions
- 692.3Other Articles
- 692.4Installation
- 692.6Listing Requirement
- 692.8Circuit Sizing and Current
- 692.9Overcurrent Protection
- 692.10Stand-Alone Systems
- 692.13All Conductors
- 692.14Provisions
- 692.17Switch or Circuit Breaker
- 692.31Wiring Systems
- 692.41System Grounding
- 692.44Equipment Grounding Conductor
- 692.45Size of Equipment Grounding Conductor
- 692.47Grounding Electrode System
- 692.53Fuel Cell Power Sources
- 692.54Fuel Shut-Off
- 692.56Stored Energy
- 692.59Transfer Switch
- 692.60Identified Interactive Equipment
- 692.61Output Characteristics
- 692.62Loss of Interactive System Power
- 692.64Unbalanced Interconnections
- 692.65Utility-Interactive Point of Connection
- 692.80General
Practice questions (0)
No practice questions tagged to Article 692 yet.
Article 692 chat