Summary
Temp power for construction and events — time limits, GFCI, and flexible cords.
- Construction sites need GFCI protection on receptacles.
- Temporary is still regulated — not a free-for-all.
Study notes from the app's code library — always confirm with the official NEC book your AHJ adopts.
Sections in Code Lookup (8)
Practice questions (3)
1.Temporary wiring for construction, remodeling, maintenance, repair, or demolition is covered by Article 590.
2.Receptacles on construction sites used by personnel shall have GFCI protection for personnel as required in 590.6.
3.Temporary wiring shall be removed immediately upon completion of construction or the purpose for which it was installed.
Pictures

590.2 · Article 590.

590.3 · Type NM cable, Type SE

590.4 · Raints Removal

590.4 · Type NM cable, Type SE

590.4 · Branch Circuits

590.5 · Cable assemblies an

590.5 · VIOLATION; Vegetation can't be

590.5 · Cable assemblies an

590.6 · Receptacles Not Part of

590.8 · GFCI protection is required for 15A, 20A, and 30A,

590.6 · GFCI protection is