Article 590

Temporary Installations

590

Temporary Installations

Special OccupanciesNEC 2008NEC 2020NEC 2026

Summary

Temp power for construction and events — time limits, GFCI, and flexible cords.

  • Construction sites need GFCI protection on receptacles.
  • Temporary is still regulated — not a free-for-all.

Study notes from the app's code library — always confirm with the official NEC book your AHJ adopts.

Sections in Code Lookup (8)

Practice questions (3)

  1. 1.Temporary wiring for construction, remodeling, maintenance, repair, or demolition is covered by Article 590.

  2. 2.Receptacles on construction sites used by personnel shall have GFCI protection for personnel as required in 590.6.

  3. 3.Temporary wiring shall be removed immediately upon completion of construction or the purpose for which it was installed.