Summary
Battery installations — working space, ventilation, disconnects, and wiring methods.
- Battery rooms need proper clearances and containment considerations.
- Coordinate with energy storage articles in later cycles.
Study notes from the app's code library — always confirm with the official NEC book your AHJ adopts.
Sections in Code Lookup (13)
- 480.1Scope
- 480.2Definitions
- 480.3Wiring and Equipment Supplied from Batteries
- 480.4Overcurrent Protection for Prime Movers
- 480.5Disconnecting Means
- 480.6Insulation of Batteries Not Over 250 Volts
- 480.7Insulation of Batteries of over 250 Volts
- 480.8Racks and Trays
- 480.9Battery Locations
- 480.10Vents
- 480.11Vents
- 480.12Battery Interconnections
- 480.13Ground-Fault Detection
Practice questions (0)
No practice questions tagged to Article 480 yet.
Pictures
Article 480 chat