372
Cellular Concrete Floor Raceways
Wiring Methods and MaterialsNEC 2008NEC 2020NEC 2026
Summary
Raceways formed in cellular concrete floors — specialized construction method.
- Specialty building system.
Study notes from the app's code library — always confirm with the official NEC book your AHJ adopts.
Sections in Code Lookup (19)
- 372.1Scope
- 372.2Definitions
- 372.4Uses Not Permitted
- 372.5Header
- 372.6Connection to Cabinets and Other Enclosures
- 372.7Junction Boxes
- 372.8Markers
- 372.9Inserts
- 372.10Size of Conductors
- 372.11Maximum Number of Conductors
- 372.12Splices and Taps
- 372.13Discontinued Outlets
- 372.17Ampacity of Conductors
- 372.18Cellular Concrete Floor Raceways Installation
- 372.20Size of Conductors
- 372.22Maximum Number of Conductors
- 372.23Ampacity of Conductors
- 372.56Splices and Taps
- 372.58Discontinued Outlets