Summary
Cablebus assemblies for industrial power distribution.
- Engineered assembly — follow listing and Article 370.
Study notes from the app's code library — always confirm with the official NEC book your AHJ adopts.
Sections in Code Lookup (20)
- 370.1Scope
- 370.2Definition
- 370.3Use
- 370.4Conductors
- 370.5Overcurrent Protection
- 370.6Support and Extension Through Walls and Floors
- 370.7Fittings
- 370.8Conductor Terminations
- 370.9Grounding
- 370.10Marking
- 370.12Uses Not Permitted
- 370.18Cablebus Installation
- 370.20Conductor Size and Termination
- 370.22Number of Conductors
- 370.23Overcurrent Protection
- 370.30Securing and Supporting
- 370.42Fittings
- 370.60Grounding
- 370.80Ampacity of Conductors
- 370.120Marking
Practice questions (0)
No practice questions tagged to Article 370 yet.
Article 370 chat
- No messages yet — start the conversation.
